Latest

All articles.

The Solar Connect

VPP-Ready Plan Sets: Get Batteries Enrolled in 2026

Quick answer: VPP-ready plan sets are what get a home battery accepted into a virtual power plant program. Before PTO, the interconnection application has to allow battery export,…

Read article
The Solar Connect

Solar Battery Proposal: Win Resilience Buyers in 2026

Solar battery proposal showing critical loads and backup hours on a tablet Odds are your next homeowner has already lost power at least once this year, and a…

Read article
The Solar Connect

Battery-Only Interconnection: 2026 Storage Retrofit Guide

Battery-only interconnection applications are piling up on installer desks this year, and most of them come from homeowners who already have panels on the roof. These customers have…

Read article
The Solar Connect

TPO Solar Proposal: Reframe Savings After the 25D Cliff in 2026

TPO Solar Proposal Playbook: Reframe Monthly Savings After the 25D CliffQuick answer: A TPO solar proposal has to show a Year 1 cost below the utility bill, then…

Read article
The Solar Connect

Solar Domestic Content Bonus 2027: How to Claim the 10% Adder

The Solar Domestic Content Bonus in 2027: How Installers Claim the 10% Adder After the Section 232 Tariffs Two dates belong on every 2027 project calendar. On December…

Read article
The Solar Connect

Meter Socket Adapter vs MPU: Skip the $3,000 Upgrade in 2026

Meter Socket Adapter vs. Main Panel Upgrade: How Installers Skip the $3,000 MPU in 2026 If you sold a battery job this year, you’ve probably watched a main…

Read article
The Solar Connect

Section 232 Solar Tariffs in 2026: Protect Margin Before Dec 4

Section 232 Solar Tariffs Hit December 4: How Installers Protect Margin Without Losing Deals in 2026 Section 232 solar tariffs December 4 2026 deadline for US solar installers…

Read article
The Solar Connect

Battery Storage Retrofit Playbook: Beat the 2027 Solar Cliff

After the 2027 Solar Cliff: The Battery Storage Retrofit Playbook for Installers (Credits, Codes, Interconnection) A battery storage retrofit is the strongest residential product left after the 2027…

Read article
The Solar Connect

FCC Inverter Ban 2026: Check Every Inverter Before You File

FCC Inverter Ban 2026: How to Check Every Inverter on Your Plan Set & Interconnection Application The FCC inverter ban 2026 changed the rules for every grid-tied job…

Read article
The Solar Connect

Solar Label Requirements 2026: Every NEC Placard by Edition

Solar Label Requirements 2026: Every NEC Placard by Edition (2020, 2023, 2026) — Wording, Size & Location Your install passed rough-in. Then the final inspector reads your rapid…

Read article
The Solar Connect

NEC 2026 vs. NEC 2023, What Changes for Solar and Battery Plan Sets with a State Adoption Tracker

Why NEC 2026 Changes Matter for Your Solar Plan Sets A rejected permit costs more than time. It stalls crews, delays installs, and frustrates homeowners who already signed.…

Read article
The Solar Connect

Do You Need a Separate Permit to Add a Battery to Existing Solar?

Solar Battery Permit Basics: Why Retrofits Trip Up Installers Your customer already has solar, and now they want backup power. Naturally, you want a fast, clean install. However,…

Read article
Aerial view of a solar array

One partner. Full pipeline. Zero bottlenecks.

However complex the project, our team brings the technical rigor to get it approved, built, and switched on.